About This File
The Anaheim Citrus Packing Shed - Purveyors of citrus fruit to grocers everywhere.
Lot Details and Information
Lot size: 5 x 4 tiles
Building style(s): Building: Industrial, Building: IM, Industry: Anchor
Growth stage: 2
Occupants: 155 I-M
Bulldoze cost: $202
Worth: $202
Construction Time: 20 days
Max. Fire Stage: 3
Power consumption: 10 MWh/month
Water consumption: 139 Gallons/month
Air pollution: 9 over 9 tiles
Water pollution: 6 over 13 tiles
Garbage pollution: 4 over 0 tiles
Dependencies
BSC MEGA Props - CP Vol01
BSC MEGA Props - JBSimio Vol03
BSC MEGA Props - Misc Vol02 v3
BSC MEGA Props - SG Vol01_v2
BSC Mega Props - JES Vol01
BSC Mega Props - JES Vol02
BSC Mega Props - JES Vol03
BSC Mega Props - JES Vol04
BSC Mega Props - JES Vol05
BSC Mega Props - JES Vol06
BSC Mega Props - JES Vol09
Grfe_Carpack_vol. 1 & 2
BSC Textures Vol 01
BSC Textures Vol 02
BSC Textures Vol 03
The above files can be found in the legacy-bsc-common-dependencies-pack found here at https://www.sc4evermore.com/index.php/downloads/.
jes_AnaheimResources.dat [included]
-
12
-
4

Supported
