About This File
NEW SIZES AVAILABLE!! There are now four different sizes available 4x13, 4x18, 4x23 and 4x28 all available in the one download. This should allow more flexibility with where you can use them. All the stats are proportional (see below). Just make sure that you run power lines or a bridge from the parking lot end to the other side cause the power is only dissipated from here. (Shown by red arrow in picture). This is because I used the wind power plant as the base.
1 Turbine Lot (4x13)
Plop Cost: $10,000
Power Generated: 3,000 MWh/Month
Monthly Cost: $375
Bulldoze Cost: $1,250
2 Turbine Lot (4x18)
Plop Cost: $20,000
Power Generated: 6,000 MWh/Month
Monthly Cost: $750
Bulldoze Cost: $2,500
3 Turbine Lot (4x23)
Plop Cost: $30,000
Power Generated: 9,000 MWh/Month
Monthly Cost: $1,125
Bulldoze Cost: $3,750
4 Turbine Lot (4x28)
Plop Cost: $40,000
Power Generated: 12,000 MWh/Month
Monthly Cost: $1,500
Bulldoze Cost: $5,000
-
6
-
2

Supported

Recommended Comments
Sign In or register to comment...
To comment in reply, you must be a community member
Sign In
Already have an account? Sign in here.
Sign In NowCreate an Account
Sign up to join our friendly community. It's easy!
Register a New Account