About This File
The Monadnock building was built in two stages.
| The northern half is built with pre-skyscraper technology: supported not by an internal skeleton but by brick walls. For this reason the walls are abnormally thick (six feet!) at the base. The south half of the building with the green trim was built using steel frame construction. |
This has a growable CO$$ lot with 650 jobs and a ploppable lot that has 500 jobs. The growable will only grow in the Chicago tileset on a 6x2 lot. ENJOY!
-