About This File
Ya, this is the BAT from the unfinished complex project: Warsaw Office Complex. This was planned at 1996/97, but the corporation which want to bulid it was closed by the Poland Goverment. I think it's project was too realistic and good. This is the first building from complex - Tower A. Tower B (smaller) is in progress in my BAT.
Please VOTE, PLEASE!!!
Details:
Warsaw Office Complex - Tower A - Landmark (5x6):
Plop cost: 75000$
Bulldoze costWorth: 750$
Pollution at center: 0 0 0 0
Pollution radii: 0 0 0 0
Monthly budget: 0$
Power: 60
Water: 10
Wealth: High
Landmark effect: 80 40
Mayor rating: 80 256
Warsaw Office Complex - Tower A - Growable CO$$$ (5x6):
Building value: 75000$
Bulldoze costWorth: 750$
Capacity satisfied: 9402|6577
Construction time: 146
Pollution at center: 16 8 32 0
Pollution radii: 3 4 0 0
Power: 300
Water: 1400
Warsaw Office Complex - Tower A - Growable CO$$ (5x6):
Building value: 66000$
Bulldoze costWorth: 660$
Capacity satisfied: 9402
Construction time: 146
Pollution at center: 20 12 40 0
Pollution radii: 4 5 0 0
Power: 400
Water: 2000
True properities:
54 floors, 250.7 meters height.
Modelling: Luceq_MC'5
Descripting file: Luceq_MC'5
LOT editing: Luceq_MC'5
Beta_Testers: Kudzu, STV, Shinky_75, MX666.
[C] 2005 XDesign Team. All Rights Reserved. XDesign production No. 004/05. www.xdesignteam.prv.pl
-
3

Supported
