Jump to content

silvercanyon2000

Member
  • Content Count

    44
  • Joined

  • Last Visited

Community Reputation

0 Clean Slate

About silvercanyon2000

  • Rank
    Sophomore
  1. NAM General Support

    I was asked that same exact question on my own Youtube channel. Apparently I wasn't clear enough... Since these are Flex pieces, the one thing missing is this: actually dragging a segment of Road to connect the two together. Thanks guys. That worked. :-)
  2. NAM General Support

    How do I connect El-Rail over Avenue to El-Rail over Road? I know that it's possible, but I don't know how to do it.
  3. NAM: Requests - 2nd Edition

    I wonder if somebody ever asked for this but are there or will there ever be smooth curves for GLR? When my subways go out into the suburbs they run above ground using GLR tracks. To make it more eye candy (but of course it should be fully transit-enabled) I would like to add wide curves: Is that possible? Thanks a lot for any hint.
  4. NAM General Support

    I made this interchange using the diagonal lateral interchange and connecting it to the avenue by using two "orthogonal to 45° curves" on each side. The two curves are connected to each other on their "orthogonal end" so they form a 45° to 45° curve. The connection of the two curves looks a little bit strange when you zoom in. It's just something like a graphic bug as the connection is fully transit enabled and UDI-vehicles can also pass it without any problems. So my question is: Can someone fix this graphic bug?
  5. nybt-forum-threads Parisian Factory for NYBT

    Hey Parisian, I have a question. Where can I get this building: Thank you very much for your help.
  6. NAM: Requests

    I would like to have higher elevated rail puzzle pieces that can go over diagonal networks. And more than this I would need higher elevated highway puzzle pieces that work the same way like the El-rail pieces shown above.
  7. Problem with avenue over sunken traffic

    Thank you warrior. Nice video
  8. Problem with avenue over sunken traffic

    Thank you for your praising words CaptCity!
  9. Problem with avenue over sunken traffic

    Haha ... the avenue really should run right next to the slope ... That's why I starded this thread. Well, meanwhile I found out how the intersection can be created: Put the T-Avenue on slope-Puzzle piece on the slope but don't connect it to the avenues. The draw the straight avenue onto the puzzle piece. Conntect both avenues with one way roads. Then demolish the road on all tiles marked with a red "X" on the picture above. Then draw the crossing avenue ... the result should look like above. Now you can draw the straight avenue onto the T. The result should be a perfect avenue intersection. This is the final Avenue-over-sunken-highway-and-GLR-section: Thank you, Thomas
  10. Problem with avenue over sunken traffic

    jim 546: Sorry, dragging an avenue over straight avenue on slope is impossible: ImVjozzi, yes, I tried to use "T"-Avenue OnSlope Puzzle Pieces. Any other opinions? Maybe we really did discover a "bug" in the NAM...?
  11. Problem with avenue over sunken traffic

    When I just build the T-piece and then try to draw the avenue through it it's just the same. See pic: to ImVhOzzi: Yes, I am using avenue-puzzle pieces as you can see. to Blue Lightning: Sorry, but I think I didn't really get waht you meant in your last post ...
  12. Problem with avenue over sunken traffic

    Thanks for your advice but it doesn't work: Or did I misunderstand you? Any other possibilities?
  13. Hi guys, I have a problem with creating an avenue that crosses a sunken highway: On the left side of the cutting I want to create an intersection between two avenues like on the right side next to the sunken GLR station. I try to place the "T"-Avenue OnSlope Puzzle Piece like so: But the result is this: I tried to place a street or a road between the highway and the slope. But when I did so it was absolutely impossible to place the Ave.-on-slope puzzle piece. I tried to place water pipes to make ground lifting impossible but it didn't work. When I place the slope-puzzle piece first then it's impossible to drag the crossing avenue over it afterwards. Why did it work on the other side of the cut? I searched the forums but couldn't find any entries concerning this problem. Can anybody help me? Thank you. Thomas
  14. Lots that fill the "gap"

    Well, finally I got it. See picture below ... Thank you for your hints. I made it by "redoing" the station lot. It's now a 4x3-lot with a 1x3-overhang on each end.
  15. Lots that fill the "gap"

    Any ideas?
×