We all know that UDoN have problems. Well, it works one way as promised but there's something that needs to be "refined" the bugs out of it.
Images below are UDoN 1.9 Alpha, may differ once the actual update is released.
Special Thanks to Banwasher who discover the bug that leads to this 1.9 updates.
The Problem #1
Unable to draw one way streets underneath the bridge.
Currently we have no explanation why a normal streets can be drawn underneath the Elevated Freeway or Ramps and not the one way streets. We assumed that's because one way streets was engineered the same way as those elevated. The question is, is it broken? Not broken but bugged. Something that we yet to understand why.
The Problem #2
Maglevs or EL Train or Subways "glitched" out using the elevated pathways.
It happens when an EL train or a Maglev tracks connected with to the elevated Ramps or Highways, the Maglevs/El Train will go on the Elevated Highways thinking it was its tracks. This is because the Elevated Highways and Ramps was based upon Maglev's Track's principal.
The Problem #2 - Solution
We have a solution for this, by "Disable the Connectors" it self. What it does, it removes the blue lines that was portrayed a pathways for the Maglevs pathways. Therefore, Maglevs no longer recognize the Elevated Highways or Ramps as its path. See Picture 2 and 3
Maglev EL Train Bug Solved
Water/Power/Sewage works on Disabled Connectors Freeway, as well as cars and other services.
This solution comes with a price, In this case I use 4 Lane Elevated Highway, with Connectors I could linked it with 1 or 2 Lane Elevated Ramps. With Connectors Disabled, Ramps or Transitions roads no longer able to connect with the Elevated Highway. Users may need to connect those ramps/transitions before Disable the Connectors.
Type of Roads Using the same connectors mechanics.
1 and 2 Lane Transitions Ramps,
1 and 2 Lane Elevated Ramps,
2 and 4 Lane Transition Highway,
2 and 4 Lane Elevated Highway
The Problem #1 - Solution
With The Problem #2 Solution, it also solved give us a temporary solution for the one way Streets to be able to drawn underneath the Disabled Connectors 4 Lane Elevated Freeway.