• Version 1.0
  • 10,584 Downloads

SPAR Distribution, by Mattb325   Though the buildings in this BAT are purely fictional, SPAR food retailers are not; with over 12,000 stores in 35 countries, the logistics required to ship so many products (fresh and packaged) requires serious space and dedicated infrastructure.   To that end, I have created a series of BATs to fulfill both CS and IHT demand. The main office building has a mix of differently tinted glass and balconies, and, as is so common in industrial parks, the large warehousing area is high-clearance and pre-fabricated concrete and steel.   The lot-work gives you four distinct options for your cities and focuses on the high-wealth. All grow at stage 3 (making them suited to both CAM and non-CAM cities).   In order to assist growth, hold down the CTRL key while zoning.   This is critical when zoning the 6x6 and 8x8 industrial lots.   Included in this download are:   4x4 CS$$$ providing 184 jobs 4x4 IHT$$$ providing 447 jobs 6x6 IHT$$$ providing 988 jobs 8x8 IHT$$$ providing 1,830 jobs     STATS 4x4 CS$$$:   Growth Stage: 3 Bulldoze Cost: $455 Capacity Satisfied: CS$$$184 (CS$$ 449, CS$ 1,786 when dilapidated) Pollution at Centre: 12 (air) / 8 (water) / 16 (garbage) Pollution Radius: 6/7/0 Power Consumed: 51 Mwh Water Consumed: 45 Gallons Construction Time: 45 days   STATS 4x4 IHT$$$:   Growth Stage: 3 Bulldoze Cost: $548 Capacity Satisfied: IHT 447 Pollution at Centre: 11 (air) / 4 (water) / 4 (garbage) Pollution Radius: 6/7/0 Power Consumed: 81 Mwh Water Consumed: 75 Gallons Construction Time: 54 days   STATS 6x6 IHT$$$:   Growth Stage: 3 Bulldoze Cost: $244 Capacity Satisfied: IHT 988 Pollution at Centre: 17 (air) / 7 (water) / 5 (garbage) Pollution Radius: 6/7/0 Power Consumed: 127 Mwh Water Consumed: 119 Gallons Construction Time: 24 days   STATS 8x8 IHT$$$:   Growth Stage: 3 Bulldoze Cost: $1,092 Capacity Satisfied: IHT 1,830 Pollution at Centre: 23 (air) / 9 (water) / 7 (garbage) Pollution Radius: 6/7/0 Power Consumed: 173 Mwh Water Consumed: 162 Gallons Construction Time: 109 days   DEPENDENCIES:   Because of the variety and specialty of lots presented, there are a few more dependencies than what I normally use, however these are VERY COMMON (note you must be registered and logged in at the SC4 Devotion LEX to download):   BSC BAT Props Mattb325 Vol03 (https://www.sc4devotion.com/csxlex/lex_filedesc.php?lotGET=2768)***** BSC BAT Props Mattb325 Vol02 (https://www.sc4devotion.com/csxlex/lex_filedesc.php?lotGET=2383) BSC Mega Props - JES Vol01 (https://www.sc4devotion.com/csxlex/lex_filedesc.php?lotGET=342) BSC MEGA Props - SG Vol 01 (https://www.sc4devotion.com/csxlex/lex_filedesc.php?lotGET=746) BSC Props Jeronij Vol 02 Trees (https://www.sc4devotion.com/csxlex/lex_filedesc.php?lotGET=167) BSC TexturePack Cycledogg V 01b (https://www.sc4devotion.com/csxlex/lex_filedesc.php?lotGET=101) BSC Essentials (https://www.sc4devotion.com/csxlex/lex_filedesc.php?lotGET=443)   ***** Absolutely essential or you will get a big brown box   I hope you enjoy this file